H.R. 2492 · 114th CongressIn committee

To direct the Secretary of the Army to provide for modification of certain Federal water resources development projects on the Apalachicola, Chattahoochee, and Flint Rivers, and for other purposes.

Latest action. Referred to the subcommitteeA smaller panel inside a standing committee with jurisdiction over a slice of its subject matter. Most hearings and the first markup usually happen here.Read the full definition (opens a new tab) on Water Resources and Environment. · May 22, 2015

Live record from Congress.gov, updated as the official record changes.
What this bill would do
Official summary · Congressional Research Service

Directs the Department of the Army to operate the Apalachicola-Chattahoochee-Flint federal water resources projects on the Apalachicola, Chattahoochee, and Flint Rivers in Alabama, Florida, and Georgia in a manner that ensures the maintenance of freshwater flows.

Defines "freshwater flows" to mean the quality, quantity, timing, and variability of freshwater flows required to: (1) support and reestablish the ecological integrity of the rivers, commercial and recreational fisheries dependent on freshwater flows into Apalachicola Bay and adjacent waters, and thriving and diverse fish, wildlife, and plant populations having species composition, diversity, adaptability, and functional organization similar to those found prior to construction of the Apalachicola-Chattahoochee-Flint projects; (2) restore and recover species that are endangered, threatened, or at risk; and (3) prevent significantly harmful adverse impacts to the Chattahoochee and Apalachicola River ecosystems.

Requires the Army to: (1) complete the ongoing revision of the water control manuals for such projects and issue revised manuals that ensure the maintenance of freshwater flows; (2) ensure that operational modifications needed to maintain freshwater flows are achieved while providing system-wide balance in conservation storage through the maintenance of water levels within the same action zone for each of the project reservoirs; (3) enter into an arrangement for the National Academy of Sciences to carry out an independent peer review of each revised manual; and (4) obtain written approval from the Environmental Protection Agency, the U.S. Fish and Wildlife Service, the National Oceanic and Atmospheric Administration, and the U.S. Geological Survey of each manual developed before a final manual may be issued.

Written by analysts at the Congressional Research Service and published on Congress.gov, not by Civibrief. Summarized at the "Introduced in House" stage on May 21, 2015. It describes the bill, it is not the legal text.

Status
Introduced
May 21, 2015
In committee
May 22, 2015
Passed a chamber
Cleared Congress
Enacted
Where this sits in the process
Common questions
Composed from the official record
Where is it in the process, and what happens next?

4 steps remain before this bill could become law.

The record's latest action, on May 22, 2015: Referred to the Subcommittee on Water Resources and Environment.

  1. Clearing the committees it was referred to, and being scheduled for a floor vote
  2. Passage by the House
  3. Passage by the Senate
  4. The President's signature. If the President vetoes it, two-thirds of both chambers must vote to override.
How likely is it to become law?

Civibrief does not forecast outcomes and this page has no opinion about this one. What the record supports is a base rate, which is a fact about the whole pile, not a prediction about this measure.

In the 114th Congress (2015-16), 329 of the 10,233 bills and joint resolutions introduced became law, about 3.2 percent. That count covers every measure at every stage, including the many that never left committee.

This one is not there yet: 4 steps are still outstanding, listed above.

Has anyone actually voted on it?

No. No roll call in this Congress cites this measure. That is the ordinary outcome: most measures never reach a recorded floor vote, and a committee ends most of them simply by not acting.

A vote is not the only thing that happens to a measure. Hearings, markups, and referrals are all recorded actions, and none of them is a vote of the full chamber.

Who is behind it?

Gwen Graham (D-FL) introduced it on May 21, 2015, and 21 members have since signed on as cosponsors.

They come from both major parties: 9 Democrats, 12 Republicans.

Cosponsoring is a formal signature on the text. It is not a commitment to vote for the measure, it does not bind anyone's party, and a long list of cosponsors is a measure of attention rather than of prospects.

How long has it been in play?

It was introduced on May 21, 2015, 4130 days ago. The most recent recorded action was 4129 days ago, on May 22, 2015.

Measures do not carry over. Anything the 114th Congress has not finished by January 3, 2017 dies when the term ends, and has to be introduced again from the start in the next Congress.

Every answer above is assembled from this measure's own record on Congress.gov and from published counts of what Congress has passed before. Civibrief does not predict outcomes and takes no position on any measure.

Vote history

  1. House
    In committee, no floor vote yet
  2. Senate
    Awaits House passage
  3. President
    Awaits both chambers
No recorded votes yet
No roll call in this Congress cites this bill. Most bills die in committee without ever reaching a recorded floor vote.