Private, no accountPrivacy details: browsing privately, no account needed
You're browsing privately, no account needed. Your region stays in this session and your precise location is never stored.What we store
H.R. 271 · 113th CongressIn committee

Resolving Environmental and Grid Reliability Conflicts Act of 2013

Latest action. Read the second time. Placed on Senate legislative calendarThe list of measures reported out of committee and eligible for floor action. Being on the calendar is not a promise of a vote.Read the full definition (opens a new tab) under General Orders. Calendar No. 82. · June 3, 2013

Live record from Congress.gov, updated as the official record changes.
What this bill would do
Official summary · Congressional Research Service

(This measure has not been amended since it was introduced. The summary of that version is repeated here.)

Resolving Environmental and Grid Reliability Conflicts Act of 2013 - Amends the Federal Power Act to require the Federal Energy Regulatory Commission (FERC) to ensure that any emergency order issued under such Act for the interconnection of facilities for the generation, transmission, and sale of electric energy, that may result in a conflict with a requirement of any environmental law, shall: (1) require generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest; and (2) to the maximum extent practical, be consistent with any other applicable environmental law and minimize any adverse environmental impacts.

Provides that any omission or action taken by a party to comply with such an order that results in noncompliance with any environmental law shall not: (1) be considered a violation of such law; or (2) subject such party to any requirement of, or any civil or criminal liability under, such law.

Requires such an order that may result in a conflict with environmental law to expire within 90 days after it is issued. Authorizes FERC to renew or reissue such order for subsequent periods, not to exceed 90 days each, as necessary to meet the emergency and serve the public interest.

Requires FERC, in renewing or reissuing such order, to: (1) consult with the primary federal agency with expertise in the environmental interest protected by such law and include in any such order conditions determined to be necessary to minimize any adverse environmental impacts, and (2) make such conditions available to the public. Authorizes FERC to exclude such a condition from the order if such condition would prevent the order from adequately addressing the emergency.

Authorizes, during an emergency, a municipality engaged in the transmission or sale of electric energy and not otherwise subject to FERC's jurisdiction to make temporary connections with public utilities subject to FERC's jurisdiction and construct temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency.

Written by analysts at the Congressional Research Service and published on Congress.gov, not by Civibrief. Summarized at the "Reported to House without amendment" stage on May 20, 2013. It describes the bill, it is not the legal text.

Status
Introduced
January 15, 2013
In committee
June 3, 2013
Passed a chamber
Cleared Congress
Enacted
Where this sits in the process
Common questions
Composed from the official record
Where is it in the process, and what happens next?

4 steps remain before this bill could become law.

The record's latest action, on June 3, 2013: Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 82.

  1. Clearing the committees it was referred to, and being scheduled for a floor vote
  2. Passage by the House
  3. Passage by the Senate
  4. The President's signature. If the President vetoes it, two-thirds of both chambers must vote to override.
How likely is it to become law?

Civibrief does not forecast outcomes and this page has no opinion about this one. What the record supports is a base rate, which is a fact about the whole pile, not a prediction about this measure.

In the 113th Congress (2013-14), 296 of the 9,091 bills and joint resolutions introduced became law, about 3.3 percent. That count covers every measure at every stage, including the many that never left committee.

This one is not there yet: 4 steps are still outstanding, listed above.

Has anyone actually voted on it?

No. No roll call in this Congress cites this measure. That is the ordinary outcome: most measures never reach a recorded floor vote, and a committee ends most of them simply by not acting.

A vote is not the only thing that happens to a measure. Hearings, markups, and referrals are all recorded actions, and none of them is a vote of the full chamber.

Who is behind it?

Pete Olson (R-TX) introduced it on January 15, 2013, and 7 members have since signed on as cosponsors.

They come from both major parties: 2 Democrats, 5 Republicans.

Cosponsoring is a formal signature on the text. It is not a commitment to vote for the measure, it does not bind anyone's party, and a long list of cosponsors is a measure of attention rather than of prospects.

How long has it been in play?

It was introduced on January 15, 2013, 4986 days ago. The most recent recorded action was 4847 days ago, on June 3, 2013.

Measures do not carry over. Anything the 113th Congress has not finished by January 3, 2015 dies when the term ends, and has to be introduced again from the start in the next Congress.

Every answer above is assembled from this measure's own record on Congress.gov and from published counts of what Congress has passed before. Civibrief does not predict outcomes and takes no position on any measure.

Vote history

  1. House
    In committee, no floor vote yet
  2. Senate
    Awaits House passage
  3. President
    Awaits both chambers
No recorded votes yet
No roll call in this Congress cites this bill. Most bills die in committee without ever reaching a recorded floor vote.